Stochastic Audit Planning and Control Using GERT Simulation

AUTHOR(S)
Zebda, Awni
PUB. DATE
June 1986
SOURCE
Accounting & Business Research (Wolters Kluwer UK);Summer86, Vol. 16 Issue 63, p235
SOURCE TYPE
Academic Journal
DOC. TYPE
Article
ABSTRACT
Auditing standards require auditors adequately to plan audit engagements and properly to supervise assistants. Technically, Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT) are limited because they are based on network modeling that may not be capable of representing an actual system. As a result of these limitations, the audit time estimated by the CPM and PERT methods may portray a misleading picture of the actual time required to complete the auditing process. Thus the purpose of this paper is to use the Graphical Evaluation and Review Technique simulation as an alternative tool for estimating audit time and, consequently, for audit planning and control.
ACCESSION #
13813012

 

Related Articles

  • MATRIX-BASED PROJECT PLANNING METHODS. Kiss, Judit; Kosztyán, Zsolt Tibor // Problems of Management in the 21st Century;2011, Vol. 1, p67 

    Network planning methods for project planning and scheduling have been applied for more than fifty years including CPM, PDM, PERT and GERT (Fondahl, 1961; Fulkerson, 1962; Kelley & Walker, 1959; PMI, 2206; Pritsker, 1966), which can be widely applied to project planning from areas as diverse as...

  • TIME-COST OPTIMIZATION MODEL FOB DETERMINISTIC NETWORK PROJECTS. Ben-Yair, Avner; Laslo, Zohar; Greenberg, Doron; Golenko-Ginzburg, Dimitri // Journal of Applied Quantitative Methods;2008, Vol. 3 Issue 4, p339 

    A deterministic PERT activity-on-arc network G(N, A) with logical operation "AND" at the event's receiver and "MUST FOLLOW" at the event's emitter, is considered. Each activity (i, j) ∊ A entering the model can be operated within several deterministic durations tij depending on the...

  • A GENERALIZED NETWORK APPROACH TO THE PLANNING AND SCHEDULING OF A RESEARCH PROJECT. Eisner, Howard // Operations Research;Jan/Feb62, Vol. 10 Issue 1, p115 

    This paper describes a configurational and mathematical tool that may be used in the planning and scheduling of a research program The configuration, termed a decision box (db) network, is a generalization of the PERT network and allows alternative procedures for accomplishing research tasks to...

  • R & D PROJECT PLANNING WITH Q-GERT NETWORK MODELING AND SIMULATION. Taylor III, Bernard W.; Moore, Laurence J. // Management Science;Jan1980, Vol. 26 Issue 1, p44 

    This paper describes a simulation study of two cases of research and development planning. The first case is for a series of R & D projects analyzed sequentially by a single R & D team, while the second case is for a series of R & D projects analyzed sequentially and concurrently by two teams....

  • Ä°ÅŸ SÃœREÇLERÄ°NÄ°N MODELLENMESÄ°NDE GERT ÅŸEBEKELERÄ°NÄ°N KULLANIMI. Aytulun, S. Kerem; Ermis, Murat // Journal of Aeronautics & Space Technologies / Havacilik ve Uzay ;2010, Vol. 4 Issue 3, p19 

    Recent years, Firms have to use various and complex business processes for providing knowledge needs that is becoming increased. With understanding impact of the business processes on performance and profitableness of the firms, many academicians and managers need to get closer these business...

  • Determining the K Most Critical Paths in PERT Networks. Dodin, Bajis // Operations Research;Jul/Aug84, Vol. 32 Issue 4, p859 

    A fundamental problem in PERT networks is to identify a project's critical paths and its critical activities. In this paper we define the criticality index of a path as the probability that the duration of the path is greater than or equal to the duration of every other path in the network and...

  • PERT and Fuzzy PERT Methods on Project Scheduling under Uncertainty. Petrovan, Adrian; Costea, Cristinel // Carpathian Journal of Electronic & Computer Engineering;2010, Vol. 3 Issue 1, p99 

    Program Evaluation and Review Technique (PERT) is the most widely used network modeling method used to track the planning activities required to complete large-scale projects. This technique has the potential to reduce the time and costs required to complete a project. Unlike classical PERT,...

  • PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT).  // Encyclopedia of Operations Research & Management Science;2001, p649 

    The article presents information on program evaluation and review technique. It is a method for planning and scheduling a project which models uncertainties in activity through the use of optimistic, likely and pessimistic time estimates for each activity.

  • Bounding the Project Completion Time Distribution in PERT Networks. Dodin, Bajis // Operations Research;Jul/Aug85, Vol. 33 Issue 4, p862 

    We consider the PERT model of a project composed of activities whose durations are random variables with known distributions. For the situations in which the activity durations are completely independent, we present a new method for obtaining a probability distribution function that bounds the...

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics