TITLE

Iran Building Oil Pipeline to Terminal Outside Gulf

PUB. DATE
January 2020
SOURCE
Pipeline & Gas Journal;Jan2020, Vol. 247 Issue 1, p12
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
The article discusses that Iran is building a 1.8 billion dollar oil pipeline to its port of Jask outside the mouth of the Gulf to protect its exports against potential problems in the region and to boost shipments of Caspian oil.
ACCESSION #
141350562

 

Related Articles

  • Perth Airport.  // AirGuide Online.com;3/8/2010, p4 

    The article reports on the plan of Westralia Airports Corp. to upgrade Perth Airport by constructing a new terminal for charter and regional flights in Australia in 2012.

  • Flint Hills Resources plans to build new fuel terminal.  // Bulk Transporter;Jul2009, Vol. 72 Issue 1, p13 

    The article reports on the plans of Flint Hills Resources LP to build a new fuel terminal in Caldwell County, North Carolina to serve the whole Texas. According to Brad Urban, senior vice president of the company, the new terminal will be operating in 2010 and its location will allow users to...

  • 4 HOURS IN... MUMBAI. Overdorf, Jason // Newsweek (Pacific Edition);11/13/2006 (Pacific Edition), Vol. 148 Issue 20, p66 

    This article presents tourism suggestions for Mumbai, India. The article suggests strolling past the Chhatrapati Shivaji Terminus, watch a game of cricket at the Oval Maiden, and eat a place of sali boti (mutton with fried potatoes) at Britannia restaurant.

  • Bringing Space and Light to the Underground. Hughes, C. J. // Architectural Record;Sep2011, Vol. 199 Issue 9, p74 

    The article reviews the architectural design of the World Trade Center Transportation Hub building in New York City, designed by architect Santiago Calatrava.

  • Block 37 bailout for CTA. Hinz, Greg // Crain's Chicago Business;6/9/2008, Vol. 31 Issue 23, p3 

    The article presents information on the plans of adding another subsidy to Block 37 el station, which is under construction in Chicago, Illinois. The construction project has been running more than $100 million over budget. Under the plans the Chicago Transit Authority board is scheduled to...

  • Nairobi Airport Expects Temporary Passenger Terminal To Be Ready In Eight Weeks.  // AirGuide For the Frequent Flyer;Sep2013, p41 

    The article reports that officials of the Kenya Airports Authority has announced that it will develop a passenger terminal for international arrivals after the fire broke out in the terminal and will also increased the construction work of a terminal which is already under construction.

  • ASIA/PACIFIC.  // Casino Journal;Nov2009, Vol. 22 Issue 11, p18 

    The article offers news briefs on casino industry in Asia and Pacific. The Wynn Macau posts an increase of 1.6 billion dollars on its initial public offering (IPO) following the strong stock exchange in Hong Kong, China. The Island of Kinmen in Taiwan applied to be a new location for casinos...

  • Tenders Info Reports 04-04-2019: Indonesia.  // Tenders Info Reports;4/4/2019, pN.PAG 

    No abstract available.

  • TEPPCO to build three new terminals.  // Bulk Transporter;Jul2008, Vol. 71 Issue 1, p50 

    The article reports on the construction of three refined product terminals along the Tennessee and Cumberland rivers by TEPPCO Partners LP. The terminals will supply markets in western Tennessee. It is expected to have 800,000 barrels of storage capacity for gasoline, diesel and biofuels. It is...

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics