TITLE

Are we there yet?

AUTHOR(S)
Plamondon Jr., W.N.
PUB. DATE
September 2004
SOURCE
Offshore;Sep2004, Vol. 64 Issue 9, p136
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
Discusses a number of factors that contributed to an increase in deepwater and ultradeepwater drilling activity in the Gulf of Mexico. Decline in rig day rates; Role of the Environmental Protection Agency's Administrative Compliance Order; Increase in deepwater plans of exploration and drilling permits.
ACCESSION #
14602439

 

Related Articles

  • Riser concept designed to reduce platform loads.  // Offshore;Oct2004, Vol. 64 Issue 10, p58 

    Reports that SEAL Engineering is developing a riser concept for ultra deepwater applications. Capability of the Hybrid S Riser system to reduce loads transmitted by the riser onto the floating production platform and to address fatigue incurred at the sag bend of steel catenary risers close to...

  • DrillLink/CyberLink saves offshore operators time and money with automated control. Florence, Fred // Offshore;Dec2008, Vol. 68 Issue 12, p68 

    The article reports on the importance of DrillLink and CyberLink technologies to the offshore oil industry. DrillLink is a simple, reliable, repeatable autopilot for drillers, and its key feature is that rigs can be retrofitted with no capital investment. On the other hand, CyberLink is added...

  • Comprehensive Settlement of the Gravitational Drilling Platform on the Seismic Action. Thien, Luu Ba; Korovkin, Vladimir // Applied Mechanics & Materials;2014, Vol. 740, p257 

    A comprehensive settlement on the seismic impact of the gravitational platform, which in two settlement schemes consistently takes into account the vertical and horizontal impact on her. The first (quasi-static) takes into account the vertical oscillations of buildings, taking into account the...

  • The Week in Review.  // New Orleans CityBusiness (1994 to 2008);9/6/2004, Vol. 25 Issue 10, p25 

    This article presents some recent news from all over the world. Houma-based Gulf Island Fabrication, which makes offshore drilling platforms, ranked No. 99 on Fortune Magazine's September 6 list of the country's top 100 fastest-growing companies. In another news, a Metairie company that helps...

  • Space Elevator.  // ENR: Engineering News-Record;Dec2004 Construction Facts, Vol. 253, p49 

    This article informs that physicist Bradley C. Edwards, using a grant from the NASA Institute for Advanced Concepts, led a two-year effort to produce an initial design for a space elevator, resulting in a report issued in 2003. It would be a refurbished oil-drilling platform. The Liftport's...

  • Menck seeks to double depth record for underwater pile-driving.  // Offshore;Oct2004, Vol. 64 Issue 10, p90 

    Features Menck's MHU 500T pile-driving hammer. Components of a deepwater pile-driving system; Suggestion that the wide range of hammer sizes with the power packs allows underwater driving of piles from conductors to large foundation piles; Plan to install a long jumper between the hammer and the...

  • Seismic analysis used in pipeline design. Qiang Bai; Wenjun Zeng; Li Tao // Offshore;Oct2004, Vol. 64 Issue 10, p100 

    Discusses the use of seismic analysis of the permanent ground deformation for buried pipes and unburied pipes and seismic ground waves for unburied pipes for designing pipeline systems. Different methods for analyzing the responses of a structure subjected to seismic ground wave; Suggestion that...

  • Spar technology meets Atlantic Canada's deepwater challenges. Murray, John // Offshore;Oct2004, Vol. 64 Issue 10, p92 

    Reports that a deepwater spar technology is being considered for Atlantic Canada's Orphan basin. Suggestion that the spar design can withstand impact from small bergy bits and sea ice can be managed through design features of the spar system; Capability of the spar's mooring and riser systems to...

  • VAALCO Energy's Ovoka Prospect well offshore Gabon disappoints.  // World Energy News;9/9/2013, p6 

    The article reports that the drilling of an exploration well on the Ovoka Prospect has completed by Vaalco Energy Inc. The company also reported that the construction of two production platforms for the development of the Etame Marin block offshore Gabon is in pipeline and confirmed that timing...

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics