TITLE

Hub-and-spoke arrangement drawing deepwater interest

AUTHOR(S)
Kliewer, Gene
PUB. DATE
January 2007
SOURCE
Offshore;Jan2007, Vol. 67 Issue 1, p64
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
The article describes the hub-and-spoke project Independence Hub located in the Eastern and Central Planning Areas of the Gulf of Mexico. The hub is designed to use 12 synthetic mooring lines to anchor the production facility. The main advantage of these kind of mooring lines is lighter weight compared to steel. In addition, the project calls for 21 exploratory wells and installation of production tubing with a dynamically positioned completion rig for the anchor fields and a semisubmersible drilling unit for the San Jacinto field.
ACCESSION #
24080693

 

Related Articles

  • Saudi Arabia dramatically increases rig count, accelerates offshore development. Jongkees, Barry // Offshore;Oct2013, Vol. 73 Issue 10, p52 

    The article reports on the rise of rig count and increase offshore development in Saudi Arabia. It states that the largest offshore oil fields of the country are Safaniya, Zuluf, Manifa, Marjan, and Abu Safah which altogether hold a total 76.1 billion barrel in reserves. According to some...

  • Moving to ultra-deep. Hartley, Frank // Offshore;Jan2006, Vol. 66 Issue 1, p22 

    The article discusses the offshore oil drilling industry's explorations into ultra-deepwater arena where rigs have to drill deeper and more challenging wells, which results into higher failure rates for top-drives. To date, the deepest offshore wells constructed have been about 35,000 feet in...

  • Meeting growing need. Hartley, Frank // Offshore;Jan2006, Vol. 66 Issue 1, p22 

    The article discusses the capacity of the modular derrick drilling machine (MDDM) to enable high-specification offshore drilling rigs to meet the growing needs for more demanding and complex wells while improving safety. To ensure safety, this top-drive will enable maintenance operations from...

  • Improving performance. Hartley, Frank // Offshore;Jan2006, Vol. 66 Issue 1, p22 

    The article discusses the Transocean's initiative to develop a new equipment, particularly a new top-drive, to improve the operational uptime and performance for drilling rigs. Among those who responded to Transocean's specification, the Aker Kvaerner MH AS (AKMH) modular derrick drilling...

  • Constitution onstream. Paganie, David // Offshore;May2006, Vol. 66 Issue 5, p16 

    This article reports that Kerr-McGee achieved first offshore oil production from the Constitution oil field in the Gulf of Mexico through a floating oil well drilling platform installed in 5,000 feet of water. Production is from one of six dry-tree wells planned by Kerr-McGee. Peak production is...

  • Design, operational standards. Paganie, David // Offshore;Nov2005, Vol. 65 Issue 11, p18 

    The article reports on the efforts of MMS Petroleum PLC in addressing and implementing any necessary modifications to standards in place for structural and operations of offshore infrastructure in the Gulf of Mexico. The company allocated over 600,000 dollars worth of contracts to study the...

  • Intelligent completion reaches the dawn of its second decade. Schrader, Kirby // Offshore;Dec2007, Vol. 67 Issue 12, p62 

    The article discusses the 10th-year anniversary of intelligent well completions in 2007, which is marked by the increase from one North Sea installation to 500 installations around the world. During the period, offshore oil drilling and production capabilities expanded to a range of...

  • Dual-role on Volvo for harsh environment jackup.  // Offshore;Aug2006, Vol. 66 Issue 8, p146 

    The article provides information about the MSC CJ-70-designed rig from Maersk Inc. It is contracted to work for Volve, a 70 MMbbl Triassic/Jurassic oilfield that will be developed in the eight platform-drilled wells. The main production equipment will comprise a process and power module on the...

  • VESSELS, RIGS, UPGRADES. Paganie, David // Offshore;Dec2007, Vol. 67 Issue 12, p24 

    The article reports on various developments relevant to vessels, rigs and upgrades to various offshore field development projects worldwide as of December 2007. It includes information on the contract awarded by Murphy West Africa Ltd. to Prosafe for the conversion of a tanker into a floating...

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics