TITLE

Project Estimate Reviews for Oil and Gas Projects

AUTHOR(S)
YuTeck Chuong
PUB. DATE
June 2007
SOURCE
AACE International Transactions;2007, p07.1
SOURCE TYPE
Academic Journal
DOC. TYPE
Article
ABSTRACT
The article presents the study of oil and gas projects and the importance of project estimate reviews for such projects. The yielding of a cost estimate that is accurate, consistent and reliable is the main purpose for project estimate reviews. The potential risk of cost growth as the project develops is also reduced.
ACCESSION #
25912701

 

Related Articles

  • The Effects of Davis-Bacon on Labor Cost and Union Wages. O'CONNELL, JOHN F. // Journal of Labor Research;Summer86, Vol. 7 Issue 3, p239 

    Two issues have seriously hampered studies of the impact of the Davis-Bacon Act. The first is that one must make assumptions about what the distribution of wages would be in the absence of the statute. It is shown that cost estimates are quite sensitive to these assumptions. The second is that...

  • Cost Estimators.  // Occupational Outlook Handbook;2006, p1 

    The article offers information about the work of cost estimators. Cost estimators are stated to be the ones responsible in compiling and analyzing data on all factors that can influence the costs involved in a project including the location of the project, special machinery equipment, as well as...

  • DEPARTMENT OF ENERGY: Actions Needed to Develop High-Quality Cost Estimates for Construction and Environmental Cleanup Projects. Aloise, Gene // GAO Reports;1/14/2010, preceding p1 

    The article presents a study by the U.S. Government Accountability Office (GAO) which aims to evaluate the cost-estimating policies and guidance of the U.S. Department of Energy (DOE). The research further intends to investigate how DOE's practices are reflected by the cost estimates of the...

  • A Method for Determining Costs Associated with Laboratory Error. Cavenaugh, Edward Lee // American Journal of Public Health;Aug1981, Vol. 71 Issue 8, p831 

    Abstract: A study directed toward developing a method for determining costs associated with laboratory error was developed, relying on panels of physicians to rank frequency of performance and impact of error of various laboratory tests. Cost estimates of error impact were then developed, using...

  • COST ESTIMATING AND CONTRACT PRICING PART 2: COST ESTIMATING FUNDAMENTALS. Garrett, Gregory A.; Calhoon, Brent A. // Contract Management;Nov2008, Vol. 48 Issue 11, p40 

    The article explains the concept of the critical fundamentals of cost estimating. It states that cost estimating is an important element of all sound economic decisions such as planning a family vacation and participating on a government team to evaluate a major new system. The common types of...

  • FAALÄ°YET TABANLI MALÄ°YETLEME: ZEYTÄ°N SEKTÖRÃœ UYGULAMASI. BEKÇİOĞLU, Selim; GÜREL, Eymen; KIZILYALÇIN, D. Ali // Journal of Accounting & Finance;Apr2014, Issue 62, p19 

    The purpose of the study named as "The Activity Based Costing: An Application in the Olive Sector" is the implementation of activity based costing in olive sector and the statement of the differences as regards to the traditional costing. The accepted basic hypothesis in the thesis is that the...

  • Balanced Scorecard, Activity-Based Costing And Company Performance: An Empirical Analysis. Maiga, Adam S.; Jacobs, Fred A. // Journal of Managerial Issues;Fall2003, Vol. 15 Issue 3, p283 

    Provides information on a study that examined the complementarity effect of balanced scorecard (BSC) and activity-based costing on organizational performance. Methodology of the study; Results and discussion on the study; Conclusions.

  • POSSIBILITIES OF IMPLEMENTATION OF THE ABC- METHOD (ACTIVITY-BASED COSTING) IN THE ENTERPRISES OF THE STEEL INDUSTRY IN ROMANIA. Capusneanu, Sorinel; Lepadatu, Gheorghe // Metalurgia International;2008 Special Issue 2, Issue S2, p12 

    This article deals with the possibilities of implementation of the Activity-Based Costing method in the enterprises of the steel industry in Romania starting from the analysis of the particularity of this branch. Those factors are highlighted, on which the successful implementation of the ABC...

  • ÇAÄžDAÅž MALÄ°YET YÖNETÄ°MÄ° SÄ°STEMLERÄ°NDEN SÃœRECE DAYALI FAALÄ°YET TABANLI MALÄ°YETLEME. Saban, Metin; İrak, Gülay Güğerçın // Zonguldak Karaelmas University Journal of Social Sciences;Dec2009, Vol. 5 Issue 10, p97 

    Time Driven Activity Based Costing is a new approach that is successful for solving problems occurring in Activity Based Costing (ABC) system and developed for being an alternative for ABC. Time Driven Activity Based Costing is an approach that is easy to apply and update, based on time,...

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics