TITLE

`Greenfield' Site No Piece of Cake for JFK's New $1.4-Billion Terminal

AUTHOR(S)
Post, Nadine M.
PUB. DATE
August 2000
SOURCE
ENR: Engineering News-Record;08/21/2000, Vol. 245 Issue 8, p78
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
Focuses on problems encountered in the construction of the John F. Kennedy International Air Terminal in New York City. Relocation of airport utility lines; Effects of the greenfield site on the steel erection sequence; Development of physical protection and a vibration monitoring system; Details on the construction plans; Specifications of the terminal.
ACCESSION #
3562401

 

Related Articles

  • A new gateway for JFK. McDonald, Michele // Air Transport World;Aug2001, Vol. 38 Issue 8, p101 

    Reports on the renovation of the Terminal 4 Building of the John F. Kennedy International Airport in New York City. Changes made to the terminal; Airlines using Terminal 4; Description of the terminal's retail court.

  • TERMINAL WORK SCHEDULED.  // ENR: Engineering News-Record;03/01/99, Vol. 242 Issue 9, p16 

    Features the construction of the American Airlines terminal at the John F. Kennedy International Airport in New York City, New York. Design and plan for the project; Features of the terminal; Other terminal construction projects.

  • Flying into the Future. Madsen, Jana J. // Buildings;Oct2001, Vol. 95 Issue 10, p34 

    Deals with the renovation project of Terminal 4 at the John F. Kennedy International Airport in Jamaica, New York City. Challenges of the renovation project; Components of Terminal 4; Improvements in the terminal's Departures lobby.

  • Air apparent. Jacobs, Karrie // New York;05/18/98, Vol. 31 Issue 19, p15 

    Probes Terminal 1, the first terminal to be built at John F. Kennedy (JFK) International Airport in New York City in 27 years. The opening of the terminal to travelers in the spring of 1998; How the design of the terminal, by William Nicholas Bodouva + Associates, compares to Eero Saarinen's...

  • TOGA party. Lefer, Henry // Air Transport World;Nov95, Vol. 32 Issue 11, p22 

    Reflects on the ground breaking for the John F. Kennedy International Airport's new Terminal One in September 1995. Equal partnership of Air France, Japan Airlines, Korean Air and Lufthansa in the Terminal One Project; Features of Terminal One; Background on Terminal One Group Association, the...

  • JFK.  // Travel Agent;4/25/94, Vol. 270 Issue 12, Airport Guide p2 

    Features the airline and terminal locations at the John F. Kennedy International Airport in New York City, New York. Airlines; IATA code; Departures; Arrivals.

  • WHICH END OF THE TUNNEL?  // Export Today's Global Business;Apr2000, Vol. 16 Issue 4, p20 

    Focuses on the problems with the terminals of the John F. Kennedy International Airport in New York City, New York. Studies of the Port Authority of New York and New Jersey on the airport; Road construction in the airport; Concerns about the redevelopment plans for the airport.

  • Alliances taxi slowly at JFK; too spread out. Lipowicz, Alice // Crain's New York Business;08/16/99, Vol. 15 Issue 33, p1 

    Focuses on New York City-based John F. Kennedy International Airport's failure to cope with the needs of global airline alliances. Dearth of terminals; Need for the Port Authority to move forward on constructing its planned light rail system.

  • JFK's $9-Billion Overhaul Lurches Forward. Post, Nadine M.; Cho, Aileen // ENR: Engineering News-Record;08/21/2000, Vol. 245 Issue 8, p72 

    Reports the progress in the reinvention of the John F. Kennedy International Airport in New York City. Difficulties encountered in the construction process; Development in the construction of the terminal area; Creation of a light-rail system; Use of a compressed selection process to shorten...

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics