TITLE

Shell's North field SIMOPS at forefront of innovation

AUTHOR(S)
Waggoner, John
PUB. DATE
April 2009
SOURCE
Offshore;Apr2009, Vol. 69 Issue 4, p36
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
The article discusses the new way to drill and prepare a well ready for start-up to be used in the Pearl GTL project adopted by Royal Dutch Shell Plc in Qatar. It is noted that the technology reduces the total operation time to only 45 days per well, instead of 75 days. Shell has adopted the simultaneously performing perforation, stimulation, and clean up operations on previously drilled and completed wells (SIMOPS) concept as part of its partnership with Qatar Petroleum Co.
ACCESSION #
38013215

 

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics