TITLE

Research Notes. THE HARMONOGRAM OF KAROL ADAMIECKI

AUTHOR(S)
Marsh, Edward R.
PUB. DATE
June 1975
SOURCE
Academy of Management Journal;Jun75, Vol. 18 Issue 2, p358
SOURCE TYPE
Academic Journal
DOC. TYPE
Article
ABSTRACT
The article discusses the harmonogram, a form of graphical analysis used by management pioneer Karol Adamiecki in developing a theory of work harmonization in Poland. His harmonograms were various work flow network diagrams, which resulted in graphical solutions to production problems. The work flow networks are associated with the family of methods, which incorporates the best features of the Gantt charts together with the network concept. Reasons are given for Gantt charts not having been recognized as utilizing work-flow concept. Program evaluation and revue techniques (PERT) are discussed.
ACCESSION #
4407774

 

Related Articles

  • ARROW DIAGRAMS. Scriabina, Natalia // Quality Progress;Apr2012, Vol. 45 Issue 4, p21 

    The article discusses arrow diagrams, which are used to demonstrate process or project activity. Particular focus is given to two project management techniques, the program evaluation review technique (PERT) and the critical path method (CPM). Examples are provided of arrow diagrams using CPM...

  • Priority Sequencing for Operations Scheduling Decisions in Capacity Constrained Multiple Projects Management in Construction Industries. Ubani, E. C.; Echeme, I. I. // Interdisciplinary Journal of Contemporary Research in Business;Aug2010, Vol. 2 Issue 4, p234 

    Capacity decisions affect the ability of management in construction industries to meet future demand for clients' requirements and competitiveness in effective project delivery. However, managing multiple construction projects with constraints in equipment and machine capacities requires a...

  • COUNSEL MORE OCCUPIED.  // Practical Accountant;Dec2004, Vol. 37 Issue 12, p20 

    The article presents a graphical representation of the Chief Counsel of the U.S. workload, which increased despite closing 91,279, cases as 99,177 were added during period studied.

  • Time Management in the Cost Evaluation of Limited Resource Programs. Sánchez-Algarra, Pedro; Anguera-Argilaga, M. // Quality & Quantity;Aug2005, Vol. 39 Issue 4, p391 

    Planning, implementing and evaluating an intervention program all hinge around time. A program’s actions are planned according to a forecast of the time required to achieve certain objectives, and the program’s implementation among a group of users is conditioned by its real time...

  • FACTORS AFFECTING THE SUCCESSFUL APPLICATION OF PERT/CPM SYSTEMS IN A GOVERNMENT ORGANIZATION. Dane, C. W.; Gray, C. F.; Woodworth, B. M. // Interfaces;Nov79, Vol. 9 Issue 5, p94 

    PERT/CPM in project management scheduling systems is applied and used less frequently than the literature would seem to suggest. Eighteen almost-identical government units were studied to document a situation that appears to be ideally suited to PERT/CPM but where the success ratio was 4 out of...

  • The Harmonogram of Karol Adamiecki. Marsh, Edward R. // Academy of Management Proceedings (00650668);1974, p32 

    The Harmonogram, an invention by Karol Adamiecki (1866-1933), an often overlooked pioneer of management who had great influence in Poland and Russia, is presented. The invention is first described in terms of its initial impact. Then its significance to the career of Adamiecki is discussed....

  • NETZPLANTECHNIK (NPT) ALS WICHTIGES INSTRUMENT DES PROJEKTMANAGEMENTS GRUNDLAGEN. Runzheimer, Bodo; Barković, Dražen // Interdisciplinary Management Research;2009, Vol. 5, p265 

    A challenging branch of mathematics called Graph Theory was the inspiration for developing two important procedures which are quite illustrative, and whose principles are relatively easy to understand and learn. This has certainly contributed to the importance that these procedures have gained...

  • MANAGE YOUR PROJECT IN KICKSTART.  // Australian PC User;Aug2009, Vol. 21 Issue 8, p94 

    The article offers information on the task list in project management tool Project Kickstart. The schedule shows a worksheet and a Gantt chart. Here one can finetune the project by determining the timing for each task and how long each will take to complete. It can also be seen clearly if the...

  • "Network Planning, the Continuing Evolution" Sobczak, Thomas V. // Academy of Management Proceedings (00650668);1963, p96 

    The article looks at the incremental development of network planning in flow charts in the United States. The impact of Line of Balance (LOB) on production process of raw materials is considered. The use of acronyms as a result of breakthroughs is mentioned. The correlation between LOB and...