TITLE

Masdar to launch carbon pipeline scheme

AUTHOR(S)
Salisbury, Peter
PUB. DATE
January 2010
SOURCE
MEED: Middle East Economic Digest;1/29/2010, Vol. 54 Issue 5, p13
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
The article reports on the move of Abu Dhabi Future Energy Co. (Masdar) to appoint an engineering contractor to oversee the first two phases of its carbon dioxide (CO2) pipeline network, as part of the emirate's carbon capture scheme.
ACCESSION #
48168748

 

Related Articles

  • Mardar has no time frame for Noor 1 solar tender. WILKINSON, PHILIPPA // MEED: Middle East Economic Digest;4/29/2015, Vol. 59 Issue 17, p13 

    The article reports on the effort of Abu Dhabi Future Energy Co. (Masdar), compiling a list of engineering, procurement and construction (EPC) contractors that will qualify to bid for its Noor 1 photovoltaic (PV) solar project in the country.

  • Masdar invites bids to build energy-efficient headquarters.  // MEED: Middle East Economic Digest;4/24/2009, Vol. 53 Issue 17, p16 

    The article reports that Abu Dhabi developer Masdar is inviting contractors to submit technical proposals by May 17, 2009 for the contract to build its headquarters in Masdar City. It is stated that bidders will submit commercial proposals and prices once the technical proposals are in. Adrian...

  • Masdar considers building solar tower in Abu Dhabi. RATCLIFFE, VERITY // MEED: Middle East Economic Digest;5/6/2011, Vol. 55 Issue 18, p10 

    The article reports that Abu Dhabi Future Energy Co. PJSC (Masdar) is considering to construct a solar power tower in Abu Dhabi, United Arab Emirates, which will the first such tower of the region.

  • Masdar to begin tendering for carbon-capture scheme. James, Ed // MEED: Middle East Economic Digest;5/16/2008, Vol. 52 Issue 20, p21 

    The article reports that Abu Dhabi Future Energy Co. is issuing a tender for engineering and design contract on its carbon-capture and storage programme in the United Arab Emirates. Three sites are understood to have been selected under phase one of the programme, which is aimed at capturing...

  • Policy must back green initiatives.  // MEED: Middle East Economic Digest;1/22/2010, Vol. 54 Issue 4, p7 

    The article reports on the impact of the Abu Dhabi Future Energy Co. (Masdar) initiative to the green projects.

  • First carbon capture deal by year end.  // MEED: Middle East Economic Digest;1/22/2010, Vol. 54 Issue 4, p13 

    The article reports on the move of Abu Dhabi Future Energy Co. (Masdar) to provide a construction deal to build the emirate's first carbon capture facilities in 2010.

  • Two firms chase Masdar headquarters deal.  // MEED: Middle East Economic Digest;1/22/2010, Vol. 54 Issue 4, p13 

    The article reports on the move of Abu Dhabi Future Energy Co. (Masdar) to discuss with Contrack International Inc. and Ed Zueblin regarding the bidding for the contract to build its headquarters at the Masdar City development in Abu Dhabi, United Arab Emirates.

  • Bids in for Masdar headquarters. FOREMAN, COLIN // MEED: Middle East Economic Digest;1/21/2011, Vol. 55 Issue 3, p17 

    The article reports that Abu Dhabi Future Energy Co. (Masdar) has received tenders from four groups for a construction contract to develop its headquarters at the Masdar City development in Abu Dhabi, United Arab Emirates.

  • Masdar to start work on hydrogen plant. Salisbury, Peter // MEED: Middle East Economic Digest;1/15/2010, Vol. 54 Issue 3, p11 

    The article reports on the construction of a hydrogen power plant in United Arab Emirates (UAE), which will start by the end of 2010 with Abu Dhabi Future Energy Co. (Masdar) and the Great Britain's BP as partners behind the scheme.

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics