PERT and Fuzzy PERT Methods on Project Scheduling under Uncertainty

AUTHOR(S)
Petrovan, Adrian; Costea, Cristinel
PUB. DATE
January 2010
SOURCE
Carpathian Journal of Electronic & Computer Engineering;2010, Vol. 3 Issue 1, p99
SOURCE TYPE
Academic Journal
DOC. TYPE
Article
ABSTRACT
Program Evaluation and Review Technique (PERT) is the most widely used network modeling method used to track the planning activities required to complete large-scale projects. This technique has the potential to reduce the time and costs required to complete a project. Unlike classical PERT, fuzzy sets theory allows both the uncertain demand and the subjective judgment of the decision maker. The main objective of this article is the presentation of theoretical aspects of the two methods of project network analysis. Uncertainity is a major problem in Operations Research, and network planning with uncertain activity durations is typically an area where stochastic and fuzzy concepts are fundamentals.
ACCESSION #
58515632

 

Related Articles

  • A GENERALIZED NETWORK APPROACH TO THE PLANNING AND SCHEDULING OF A RESEARCH PROJECT. Eisner, Howard // Operations Research;Jan/Feb62, Vol. 10 Issue 1, p115 

    This paper describes a configurational and mathematical tool that may be used in the planning and scheduling of a research program The configuration, termed a decision box (db) network, is a generalization of the PERT network and allows alternative procedures for accomplishing research tasks to...

  • A New View of the Precedence Diagramming Model - Towards a Vectorized Event Scheduling Technique. Piney, Crispin 'Kik' // PM World Today;Mar2012, Vol. 14 Issue 3, Special section p1 

    The article focuses on Vectorized Event Scheduling Technique (VEST), used for constructing a schedule model, in which activities are represented by their start and finish events. Methods which can be seamlessly integrated into the VEST include program evaluation and review technique (PERT),...

  • A BRANCH-AND-BOUND PROCEDURE FOR THE MULTIPLE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM. Demeulemeester, Erik; Herroelen, Willy // Management Science;Dec1992, Vol. 38 Issue 12, p1803 

    In this paper a branch-and-bound procedure is described for scheduling the activities of a project of the PERT/CPM variety subject to precedence and resource constraints where the objective is to minimize project duration. The procedure is based on a depth-first solution strategy in which nodes...

  • Fuzzy Pert and its Application to Machine Installation Process. Ertuğrul, Írfan; Karakaşoğlu, Nílsen // Journal of Multiple-Valued Logic & Soft Computing;2008, Vol. 15 Issue 1, p65 

    Program Evaluation and Review Technique (PERT) is a well known method that helps managers plan, schedule, monitor, and control large and complex projects. In classical PERT activity durations are represented with crisp numbers. However, decision makers often have difficulty in estimating the...

  • Grey Critical Chain Project Scheduling Technique and Its Application. Gao Peng; Feng Junwen; Wang Huating // Canadian Social Science;2007, Vol. 3 Issue 3, p35 

    Based on the idea of Grey System and interval number coefficient notation, a Grey Critical Chain scheduling approach is studied. According to Grey system theory, the time of project or task completion can be considered as the object that extension is definite but intension is uncertain, which is...

  • Stochastic Audit Planning and Control Using GERT Simulation. Zebda, Awni // Accounting & Business Research (Wolters Kluwer UK);Summer86, Vol. 16 Issue 63, p235 

    Auditing standards require auditors adequately to plan audit engagements and properly to supervise assistants. Technically, Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT) are limited because they are based on network modeling that may not be capable of representing...

  • MATRIX-BASED PROJECT PLANNING METHODS. Kiss, Judit; Kosztyán, Zsolt Tibor // Problems of Management in the 21st Century;2011, Vol. 1, p67 

    Network planning methods for project planning and scheduling have been applied for more than fifty years including CPM, PDM, PERT and GERT (Fondahl, 1961; Fulkerson, 1962; Kelley & Walker, 1959; PMI, 2206; Pritsker, 1966), which can be widely applied to project planning from areas as diverse as...

  • PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT).  // Encyclopedia of Operations Research & Management Science;2001, p649 

    The article presents information on program evaluation and review technique. It is a method for planning and scheduling a project which models uncertainties in activity through the use of optimistic, likely and pessimistic time estimates for each activity.

  • FUZZY PERT FOR PROJECT MANAGEMENT. Saadoon Al Samman, Thaeir Ahmed; Ramo Al Brahemi, Ramadan M. // International Journal of Advances in Engineering & Technology;Sep2014, Vol. 7 Issue 4, p1150 

    One of the most challenging jobs that any manager can take on in the management of a large scale project that requires coordinating numerous activities throughout the organization. A myriad of details must be considered in planning how to coordinate all these activities, in developing a...

Share

Read the Article

Courtesy of NEW JERSEY STATE LIBRARY

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics