TITLE

Liquidated damages

AUTHOR(S)
Sutherland, Fiona
PUB. DATE
July 2002
SOURCE
International Construction;Jul/Aug2002, Vol. 41 Issue 6, p34
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
Explores the use of hydrodemolition technology for repairing sensitive reinforced concrete structures. Use of high-pressure water jets to remove concrete by direct impact; Advantages of hydrodemolition; Use of the technology for bridge repair. INSET: Remote repair.
ACCESSION #
7206058

 

Related Articles

  • 105-S41—Experimental Study on Progressive Collapse-Resistant Behavior of Reinforced Concrete Frame Structures. Wei-Jian Yi; Qing-Feng He; Yan Xiao; Kunnath, Sashi K. // ACI Materials Journal;Jul/Aug2008, Vol. 105 Issue 4, p421 

    An abstract of the article "Experimental Study on Progressive Collapse-Resistant Behavior of Reinforced Concrete Frame Structures" is presented.

  • Geosynthetic reinforced soil piers: A bridge from the past to the present. Rekenthaler, Doug // Public Roads;Winter97, Vol. 60 Issue 3, p43 

    Describes the construction of a geosynthetic reinforced soil (GRS) structure in McLean, Virginia. Use of the GRS structure as alternative to high-priced reinforced concrete bridges; Comments from research geologist Michael Adams on the uses of GRS; Load-bearing capabilities of the GRS structure.

  • ERRATA.  // ACI Structural Journal;Nov/Dec2007, Vol. 104 Issue 6, p767 

    A correction to the article "Justification of AC1446 Code Provisions for Shear Design of Reinforced Concrete Beams" that was published in the September-October 2007 issue is presented.

  • Eliminating entry pits. Salvail, Kenneth L.; Gellings, Dave // Underground Construction;May97, Vol. 52 Issue 5, p29 

    Details the city of San Jose, California's Senter-Monterey Rehabilitation Phase II which involved sliplining of corroded, reinforced concrete pipe. Partnership with Dave Gellings of Trenchless Resources International Inc. to slipline the mobile park section without access pits; Savings on...

  • Reinforcement from above.  // ENR: Engineering News-Record;09/07/98, Vol. 241 Issue 9, p15 

    Presents a construction method for the reinforcement of concrete arches, as used in the Bixby Creek Bridge in Northern California. Size and vertical drop of the bridge; Functions of the interconnected platform sections for bridge retrofitting.

  • CRSI announces award winners.  // American City & County;Jul94, Vol. 109 Issue 8, p18 

    Announces the winners of the Concrete Reinforcing Steel Institutes' 12th biennial Design Awards Competition. Recognition on four structures built of cast-in-place reinforced concrete; Listing of winners.

  • preface. Al-Mahaidi, Riadh // Australian Journal of Structural Engineering;2011, Vol. 11 Issue 2, preceding p75 

    The article discusses various reports published within the issue, including one by S.T. Smith and S.J. Kim on deflection calculation of fibre-reinforced polymers (FRP) strengthened reinforced concrete flexural members, one by A. Godat on numerical modelling of shear crack angles in FRP, and one...

  • Inner Strength. Vaillancourt, Gaetan // Concrete Products;Oct2002, Vol. 105 Issue 10, p20 

    Reports on the replacement of corrugated metal pipe tunnel in Lewiston, Maine with a reinforced concrete pipe (RCP) structure using an innovative installation method. Name of the contractor who devised the method; Description of the method; Fabrication of a special cart to push the concrete...

  • AND THE WALLS DIDN'T COME TUMBLING DOWN. Tresilian, David // UNESCO Sources;Dec2000, Issue 129, p22 

    Clarifies the misconception that traditional masonry technique was unsafe compared to modern reinforced concrete, in structural engineering. Advantages offered by traditional building techniques in earthquake-prone areas; Overview on the special seismic properties of vernacular architecture;...

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics