TITLE

PacifiCorp joins 474-MW cogen accord with USGen

PUB. DATE
December 1993
SOURCE
Electrical World;Dec93, Vol. 207 Issue 12, p9
SOURCE TYPE
Trade Publication
DOC. TYPE
Article
ABSTRACT
Announces the signing of a contract by PacifiCorp to purchase electricity from a natural-gas-fired generating plant that US Generating Co. plans to build. Resource portfolio; Open planning.
ACCESSION #
9409071132

 

Related Articles

  • USGen plant enters commercial service. Chambers, Ann // Power Engineering;Feb96, Vol. 100 Issue 2, p12 

    Reports that U.S. Generating Co.'s Northampton, Massachusetts generating plant has entered commercial service.

  • U.S. Gen plant changes name. Chambers, Ann // Power Engineering;Aug96, Vol. 100 Issue 8, p15 

    Reports that U.S. Generating Co. has changed the name of its Altresco-Pittsfield Cogeneration Plant to Pittsfield Generating Plant.

  • System modeling speeds clamshell unloader delivery. Schuster, James W.; Zirkler, Adolf H. // Power Engineering;Apr95, Vol. 99 Issue 4, p35 

    Describes the U.S. Generating Co.'s Logan Generating Station in New Jersey along the Delaware River. Concerns over unusual regulatory issues because the plant's coal barge unloading system extends into the river under Delaware's jurisdiction; Terms of project contract; Protecting the...

  • Fluid conditions underpin solid growth of power market. Armistead, Thomas F. // ENR: Engineering News-Record;03/30/98, Vol. 240 Issue 13, p13 

    Presents information on the growth of the electricity market in California. Description of the market's structure; Comments by the United States Generating Company President and chief executive officer Joseph P. Kearney; What the changed market will consist of; Expected capacity increase.

  • Millennium orders 501G.  // Modern Power Systems;May98, Vol. 18 Issue 5, p11 

    Reports that US Generating Co. has placed a contract with Westinghouse Corp. for its 501G gas turbine.

  • Cedar Bay `pushes envelope' to reduce environmental impact. Makansi, Jason; Jones, Cate // Power;Apr95, Vol. 139 Issue 4, p21 

    Reports on US Generating Co.'s efforts to reduce the environmental impact of the operation of the Cedar Bay generating plant in Florida. Use of circulating fluidized-bed (CFB) boilers; Accomplishment of zero-discharge water management; Addition of a selective non-catalytic reduction (SNCR) system.

  • PacifiCorp breaks ground for customer service center in West Valley City.  // Enterprise/Salt Lake City;11/04/96, Vol. 26 Issue 19, p3 

    Reports on the ground breaking for Oregon-based PacificCorp's customer service center in West Valley City's Lake Park Corporate Center in Utah. Aim to convert the customer service system to a state-of-the-art phone and computer capability; Financial performance; Clientele; Business activity.

  • Portland firm demonstrates ergonomics on a shoestring. Novitski, B. J. // Architectural Record;Feb1998, Vol. 186 Issue 2, p34 

    Presents information on the design of a regional call center for PacifiCorp. Information on the size of the center; Reference to the importance of a well designed setting for employees; Who designed the center.

  • Pacificorp.  // Wood & Wood Products;Jul93, Vol. 98 Issue 8, p191 

    Features PacifiCorp electric company. Recruitment of industry; State serviced; Advantages for wood products.

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics