TITLE

Calibre and B2Gold extended trench intercept to 61.9 metres at the Minnesota gold project, Nicaragua

PUB. DATE
July 2014
SOURCE
World Mining News;7/ 8/2014, p1
SOURCE TYPE
Newswire
DOC. TYPE
Article
ABSTRACT
The article focuses on the results of operations of Calibre Mining Corp. on the trenching and sampling project at the Minnesota Gold Project as part of the joint venture with the B2Gold Corp. It mentions that the results of the venture have identified the extension of the previously identified gold mineralization. It adds that the exploration of the Minnesota site continues with additional trenches.
ACCESSION #
96989595

 

Related Articles

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics