ABSTRACT
As many nuclear power plants are reaching their end of lifecycle, the decommissioning of these installations has become one of the 21st century's great challenges. Each project may be managed differently, depending on the country, development policies, financial considerations, and the availability of qualified engineers or specialized companies to handle such projects. The principle objective of decommissioning is to place a facility into such a condition that there is no unacceptable risk from the decommissioned facility to public health and safety of the environment. In order to ensure that at the end of its life the risk from a facility is within acceptable bounds, action is normally required. The overall decommissioning strategy is to deliver a timely, cost-effective program while maintaining high standards of safety, security and environmental protection. If facilities were not decommissioned, they could degrade and potentially present an environmental radiological hazard in the future. Simply abandoning or leaving a facility after ceasing operations is not considered to be an acceptable alternative to decommissioning. The final aim of decommissioning is to recover the geographic site to its original condition.
ACCESSION #
97069960

 

Related Articles

  • CONSIDERATIONS FOR THE DEVELOPMENT OF A DEVICE FOR THE DECOMMISSIONING OF THE HORIZONTAL FUEL CHANNELS IN THE CANDU 6 NUCLEAR REACTOR PART 3 - FUEL CHANNEL REFERENCES. ROSCA FARTAT, Gabi; STANESCU, Constantin D.; POPESCU, Constantin // Fiability & Durability / Fiabilitate si Durabilitate;2014 Supplement, Issue 1, p173 

    As many nuclear power plants are reaching their end of lifecycle, the decommissioning of these installations has become one of the 21st century's great challenges. Each project may be managed differently, depending on the country, development policies, financial considerations, and the...

  • CONSIDERATIONS FOR THE DEVELOPMENT OF A DEVICE FOR THE DECOMMISSIONING OF THE HORIZONTAL FUEL CHANNELS IN THE CANDU 6 NUCLEAR REACTOR PART 4 - FUEL CHANNEL ASSEMBLY. ROSCA FARTAT, Gabi; STANESCU, Constantin D.; POPESCU, Constantin // Fiability & Durability / Fiabilitate si Durabilitate;2014 Supplement, Issue 1, p182 

    As many nuclear power plants are reaching their end of lifecycle, the decommissioning of these installations has become one of the 21st century's great challenges. Each project may be managed differently, depending on the country, development policies, financial considerations, and the...

  • CONSIDERATIONS FOR THE DEVELOPMENT OF A DEVICE FOR THE DECOMMISSIONING OF THE HORIZONTAL FUEL CHANNELS IN THE CANDU 6 NUCLEAR REACTOR PART 5 - FUEL CHANEL DECOMMISSIONING. FARTAT, Gabi ROSCA; STANESCU, Constantin D.; POPESCU, Constantin // Fiability & Durability / Fiabilitate si Durabilitate;2014 Supplement, Issue 1, p195 

    As many nuclear power plants are reaching their end of lifecycle, the decommissioning of these installations has become one of the 21st century's great challenges. Each project may be managed differently, depending on the country, development policies, financial considerations, and the...

  • Decommissioning of nuclear and radiation hazardous objects and handling of spent fuel and radwastes. Romenkov, A.; Yarmolenko, O.; Andreeva, L.; Ermoshin, F.; A.Tuktarov, M.; Semenikhin, V.; Ufaev, N. // Atomic Energy;Nov2012, Vol. 113 Issue 1, p64 

    The results of construction and design work implemented at the Beloyarskaya NPP and making it possible to increase the safety of first-phase units and develop ways to handle spent fuel and radwastes are presented. The experience gained in the work at the Beloyarskaya NPP has been used to develop...

  • Bruce A Proves There Are Second Acts in Nuclear Power. Hylko, James M.; Peltier, Robert // Power;Aug2010, Vol. 154 Issue 8, p46 

    The article focuses on the Bruce Nuclear Generating Station located on the eastern shore of Lake Huron, Toronto, Ontario, which was regarded by experts as the leading nuclear capacity factors of Canada. It is stated that the Bruce A and Bruce B of the nuclear plant has four Canada deuterium...

  • International team review nuclear regulation.  // RoSPA Occupational Safety & Health Journal;Nov2013, Vol. 43 Issue 11, p3 

    The article reports on the progress of the nuclear regulatory system in Great Britain. An international team of nuclear experts said that Great Britain has effectively responded to Fukushima Nuclear Accident in Japan. However, the team has identified various areas that need attention or...

  • Extra-Territorial Siting of Nuclear Installations. Shea, Thomas E.; Morris, Frederic A. // Proceedings of the Institute of Nuclear Materials Management Ann;2009, p1 

    Arrangements might be created for siting nuclear installations on land ceded by a host State for administration by an international or multinational organization. Such arrangements might prove useful in terms of resolving suspicions of proliferation in troubled areas of the world, or as a means...

  • Waste not, want not?  // Bulletin of the Atomic Scientists;Jun1991, Vol. 47 Issue 5, p6 

    This article discusses the recycling of several nuclear energy facilities in Germany. Last year Germany dropped the Wackersdorf nuclear fuel reprocessing plant; this year it's goodbye to the Kalkar prototype fast-breeder reactor (Nature, March 28, 1991). The three utilities scheduled to operate...

  • The importance of complete and adequate decommissioning. Fishwick, Tony; Gill, Geoff // Loss Prevention Bulletin;Dec2013, Issue 234, p19 

    When plant or equipment is decommissioned at the end of its useful life, it is very important from a safety point of view, that some key factors are adequately ensured. One of these is that all process fluids, solids or other materials are removed from the equipment before it is declared ready...