TITLE

Block 2 of Paks nuclear plant licensed to operate until end-2034

PUB. DATE
November 2014
SOURCE
Hungary A.M.;11/26/2014, p7
SOURCE TYPE
Periodical
DOC. TYPE
Article
ABSTRACT
The article reports about the extension in the license of number 2 block of the Paks nuclear power plant, in Central Hungary, by the Hungary's National Atomic Energy Office (OAH), and states that the license would be active until December 31, 2034.
ACCESSION #
99716136

 

Related Articles

  • Statement from Scenic Hudson regarding the re-licensing of Indian Point. Brenner, William A. // Hudson Valley Business Journal;7/23/2007, Vol. 18 Issue 30, p12 

    A letter to the editor is presented in response to Attorney General Andrew M.Cuomo filling of a brief urging the Nuclear Regulatory Commission (NRC) to broaden the criteria in relicensing nuclear power plants.

  • A Coalition Forms for Nuclear Power Advocacy. Ruth, João-Pierre S. // njbiz;9/10/2007, Vol. 20 Issue 38, p17 

    The article reports on the formation of New Jersey Affordable, Clean, Reliable Energy Coalition (NJ ACRE), which is advocating for the operating license renewal of the Oyster Greek Generating Station nuclear power plant. According to former Board of Public Utilities president and NJ ACRE...

  • Licensing bid a sign PSEG prizes nuclear. Kaltwasser, Jared // njbiz;11/22/2010, Vol. 23 Issue 47, p3 

    The article reports that the National Regulatory Commission (NRC) is deliberating whether to grant the 20-year license extensions for the nuclear plants in Hope Creek, Salem 1 and Salem 2 in Salem County, New Jersey.

  • Nuke plants on hold.  // New Scientist;8/18/2012, Vol. 215 Issue 2878, p5 

    The article reports on an August 8, 2012 decision by the U.S. Nuclear Regulatory Commission (NRC) that prohibits the licensure of additional nuclear power plants and the renewal of existing nuclear plant licenses until a solution for the disposal of U.S. nuclear waste can be found.

  • Licence issued for proposed nuclear units at Vogtle.  // Modern Power Systems;Mar2012, Vol. 32 Issue 3, p5 

    The article reports that the Voglte nuclear plants of Georia Power Co. near Waynesboro, Georgia has been approved by the U.S. Nuclear Regulatory Commission (NCR) has to be issued with the Combined Construction and Operating License (COL).

  • NRC Issus Final Safety Evaluation Report On Operating License for Columbia Station.  // Nuclear Waste News;3/26/2012, Vol. 32 Issue 6, p8 

    The article presents information on final safety evaluation report which has been issued by the U.S. Nuclear Regulatory Commission regarding the renewal of Columbia Generating Station's operating license.

  • Nuclear plant gets key clearance.  // Telegraph (Calcutta, India);7/11/2013, p1 

    The article reports on the clearance granted by the Atomic Energy Regulatory Board (AERB) to the first of two delayed 1000MW atomic power plants in Kudankulam, Tamil Nadu, to start controlled nuclear fission, which is a key step towards power production.

  • Grassroots Growing? SCHIMMOLLER, BRIAN // Power Engineering;Jan2016, Vol. 120 Issue 1, p14 

    The article offers the author's insights on the optimistic views for the nuclear power prospecting in the U.S. The author discusses the gaining momentum for nuclear power sustainability, ramifications of the FitzPatrick nuclear plant closure in New Hampshire, and the license renewal for nuclear...

  • Money Loves Power. Chanen, Jill Schachner // ABA Journal;Jul2007, Vol. 93 Issue 7, p15 

    The article focuses on the rise of a small group of lawyers and law firms in the U.S. that provide services related to the licensing of nuclear reactors. Industry lawyers expect to see more than 30 applications for new reactors and plants filed with the Nuclear Regulatory Commission in the next...

Share

Read the Article

Courtesy of NEW JERSEY STATE LIBRARY

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics