TITLE

BRITISH RAIL'S UNSETTLED VIADUCT

AUTHOR(S)
Aldous, Tony
PUB. DATE
March 1988
SOURCE
History Today;Mar88, Vol. 38 Issue 3, p2
SOURCE TYPE
Periodical
DOC. TYPE
Article
ABSTRACT
Reports on an offer received by British Rail from English Heritage for the repair of the Ribblehead Viaduct on the Settle-Carlisle Line in England. Plan of British Rail on the closure of the line; History of the Settle-Carlisle Line; Estimates on the cost of the repair.
ACCESSION #
46335520

 

Related Articles

  • Glorious Suns? Storey, R. L. // History Today;Apr89, Vol. 39 Issue 4, p50 

    Reviews two books. "Henry V and the Southampton Plot," by T. B. Pugh and "Duke Richard of York 1411-1460 ," by P. A. Johnson.

  • BRITISH RAIL'S UNSETTLED VIADUCT. Aldous, Tony // History Today;Mar88, Vol. 38 Issue 3, p2 

    Reports on an offer received by British Rail from English Heritage for the repair of the Ribblehead Viaduct on the Settle-Carlisle Line in England. Plan of British Rail on the closure of the line; History of the Settle-Carlisle Line; Estimates on the cost of the repair.

  • Steam returns to Penistone.  // Railways Illustrated;Jun2009, Vol. 7 Issue 6, p38 

    The article reports on the steam-hauled railtour of Past-Time Rail's locomotive at Springwood Viaduct after its renovation in Huddersfield, England. It notes that the train was traveling in a circular route from Manchester Victoria to Sheffield, and was double-headed by British Rail's Standard...

  • Defiance repaint nearly complete.  // Railways Illustrated;Sep2010, Vol. 8 Issue 9, p16 

    The article reports on the final stages of the repaint of the 50049 Defiance locomotive into a large logo livery with a black roof, with only the British Rail (BR) double arrow logos needed for the completion.

  • BR farewell tour look for Deltic.  // Railways Illustrated;May2011, Vol. 9 Issue 5, p34 

    The article reports on the repainting of British Rail's ELR-based Deltic 55022 Royal Scots Grey railroad train to celebrate its 50th birthday.

  • Prototype HST Recreated.  // Railways Illustrated;Apr2016, Vol. 14 Issue 4, p24 

    The article reports on the repainting of the three Mk 3 passenger train coaches from 125 Group into British Rail Prototype High Speed Train blue and grey.

  • Chiltern main line set to challenge West Coast.  // Modern Railways;Jun2011, Vol. 68 Issue 753, p74 

    The article focuses on the Evergreen 3 Phase 2 project being conducted in Great Britain in 2011 wherein the services of the Chiltern main rail line will be enhanced. The main line between Paddington and Birmingham Snow Hill, England is associated to the electrification of the West Coast main...

  • Major repairs urged in places of worship. Tilley, Jonathan // Planning (14672073);7/2/2010, Issue 1875, p5 

    The article reports on the results of the survey conducted by the English Heritage on the approximately 1,500 churches that need urgent repairs in England.

  • Deltic engine overhaul starts.  // Railways Illustrated;Oct2009, Vol. 7 Issue 10, p21 

    The article reports on the repair and overhaul of the damaged Napier D-18-25B Engine unit 413 of the blue Deltic 55022 Royal Scots Grey owned by British Rail after it suffered a major failure on September 6, 2006 in Doncaster, England. It cites the engine was dismantled wherein the cylinder...

  • KWVR prepares second DMU.  // Railways Illustrated;Nov2008, Vol. 6 Issue 11, p33 

    The article offers information on the status of the repair and restoration of the Class 108, second diesel multiple unit (DMU), at Keighley and Worth Valley Railway in Great Britain. The work continues and once complete it will be withdrawn on the facility and will work services for 15 years....

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics