TITLE

PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT)

PUB. DATE
January 2001
SOURCE
Encyclopedia of Operations Research & Management Science;2001, p649
SOURCE TYPE
Book
DOC. TYPE
Reference Entry
ABSTRACT
The article presents information on program evaluation and review technique. It is a method for planning and scheduling a project which models uncertainties in activity through the use of optimistic, likely and pessimistic time estimates for each activity.
ACCESSION #
21891778

 

Related Articles

  • ADVANCED NETWORK TECHNIQUES. O'Brien, James J. // SAM Advanced Management Journal (00360805);Fall69, Vol. 34 Issue 4, p77 

    Presents information on advanced techniques for management, such as the critical path method (CPM) and the program evaluation and review technique (PERT). Developers of CPM; Adoption of PERT by the aerospace industry; Information on some network variations.

  • A new probabilistic approach to the path criticality in stochastic PERT. Monhor, Davaadorjin // Central European Journal of Operations Research;Dec2011, Vol. 19 Issue 4, p615 

    The notion of critical path is a key issue in the temporal analysis of project scheduling in deterministic setting. The very essence of the CPM consists in identifying the critical path, i.e., the longest path in a project network, because this path conveys information on how long it should take...

  • Critical Path Analysis for New Product Planning. Wong, Yung // Journal of Marketing;Oct64, Vol. 28 Issue 4, p53 

    Since its inception in 1957, Critical Path Analysis (CPA), which includes the CRITICAL PATH METHOD (CPM), and PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) has received widespread acclaim as a planning, scheduling, and control tool. Its applications had been initially restricted to construction...

  • AN ALGEBRA FOR THE ANALYSIS OF GENERALIZED ACTIVITY NETWORKS. Elmaghraby, Salah E. // Management Science;Apr1964, Vol. 10 Issue 3, p494 

    This paper generalizes the approach of activity networks, exemplified by PERT and CPM, to networks in which activates and events occur probabilistically and contain logical relationships of a more complicated nature. For example, from a specific event some activities are undertaken with...

  • A BRANCH-AND-BOUND PROCEDURE FOR THE MULTIPLE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM. Demeulemeester, Erik; Herroelen, Willy // Management Science;Dec1992, Vol. 38 Issue 12, p1803 

    In this paper a branch-and-bound procedure is described for scheduling the activities of a project of the PERT/CPM variety subject to precedence and resource constraints where the objective is to minimize project duration. The procedure is based on a depth-first solution strategy in which nodes...

  • PERT AND THE AUDITOR. Burgber, Peter H. // Accounting Review;Jan1964, Vol. 39 Issue 1, p103 

    In July, 1962, all companies working on research and development contracts for the U.S. Department of Defense or the U.S. National Aeronautics and Space Administration were advised by those agencies that they would be expected, in the future to employ (PERT) in planning and controlling their...

  • EARLIEST START TIME.  // Encyclopedia of Operations Research & Management Science;2001, p221 

    A definition of the term "earliest start time" is presented. As described in a project network, it refers to the earliest possible time an activity can begin without reducing the duration of any of the preceding activities. It is computed by adding the duration of all activities on the longest...

  • Fuzzy Pert and its Application to Machine Installation Process. Ertuğrul, Írfan; Karakaşoğlu, Nílsen // Journal of Multiple-Valued Logic & Soft Computing;2008, Vol. 15 Issue 1, p65 

    Program Evaluation and Review Technique (PERT) is a well known method that helps managers plan, schedule, monitor, and control large and complex projects. In classical PERT activity durations are represented with crisp numbers. However, decision makers often have difficulty in estimating the...

  • THE PERT MODEL FOR THE DISTRIBUTION OF AN ACTIVITY TIME. Clark, Charles E. // Operations Research;May/Jun62, Vol. 10 Issue 3, p405 

    The article deals with the use of the Program Evaluation and Review Techniques (PERT) model for the distribution of an activity time. The author states that the PERT analysis was constructed for a specific problem related to the scheduled dates for the development of the Polaris weapon system....

Share

Read the Article

Courtesy of THE LIBRARY OF VIRGINIA

Sorry, but this item is not currently available from your library.

Try another library?
Sign out of this library

Other Topics